Among our most important projects are the following
Análisis de Risk analysis and estimation of PMLs (Maximum Probable Losses)
• Laguna Verde Nuclear Power Plant.
• 2 sections of the Maya Train.
• Supervía Poniente.
• Mexico's new International Airpot.
• Pemex, PEP, Refining and
Petrochemicals.
• CFE all generation plants.
• More than 10 gas pipelines.
• More than 20 fuel storage stations.
• More than 20 highways.
Risk inspections of:
• Azteca constructions vessel.
• Nahuatl drilling rig.
• All Pemex refineries and Petrochemicals.
• Hydroelectric plants El cajón, Chicoasen and
El caracol.
ACR (Root Cause Analysis) and determination of the magnitude of demage of:
• Assessment of demage to SCT infrastructure under the FONDEN program.
• Viscosity reduction plant,Tula refinery.
• Colapse of 250,000 barrels due to negative tank pressure.
• Pajaritos Petrochemical Explosion.
• El Encanto Hydroelectric power house flood.
• Damage to power plant transformers in Central America due to oil degradation.